Nos Réalisations Industrielles
Découvrez notre historique technique de constructions de chalutiers, d'intégrations de systèmes et de projets de chaudronnerie lourde.
ShipbuildingCADAMAR-3
Construction and sea trials of the coastal fishing vessel 'CADAMAR-3'. Reinforced steel hull, nozzle propeller for enhanced propulsion and fuel efficiency.
TugboatsORION TUG 28
Engineering design and general layout blueprints for the twin-screw tugboat 'ORION TUG 28'. Optimized for complex port and coastal operations.
Coastal PatrolFALCON EXPRESS
Construction of the fast patrol vessel 'FALCON EXPRESS' utilizing high-resistance marine aluminium hull for coastal surveillance operations.
EngineeringBALLAST RETROFIT
Overhaul and installation of a high-capacity automatic ballast system to optimize cargo vessel stability and list control.
ShipbuildingAL BOUGHAL
Construction of the modern deep-sea steel trawler 'AL BOUGHAL', equipped with heavy hydraulic winches and advanced freezing hold systems.
EngineeringDRYDOCK REBUILD
Structural realignment and load-bearing layout overhaul of drydock blocking pedestals for commercial vessel refits.
EngineeringSHAFT ALIGNMENT
Precision lathe machining, laser shaft alignment, and dynamic balancing of a bronze propulsion shaft and sleeve bearing.
ShipbuildingTANTAN HULL REFIT
Major steel re-plating and structural underwater hull frame restoration on the trawler 'TANTAN-5'.
EngineeringHEAVY FABRICATION
Custom fabrication, heavy assembly, and pressure testing of industrial boilers and exhaust manifolds.
Sports InfrastructurePrince Moulay Abdellah Sports Complex
Construction of the Prince Moulay Abdellah Sports Complex in Rabat: featuring a 70,000-seat football stadium, a 21,000-seat Olympic athletics stadium, modern facilities, and an underground parking garage with a capacity of 3,000 cars.
























